Solar feed-in tariffs in Victoria: why exports earn so little now

Victoria has had no minimum solar feed-in tariff since 1 July 2025, so each retailer sets its own, and it cannot be below zero. The last regulated minimum was 3.3 cents per kWh in 2024 to 2025. Exported solar now earns little, so the value of solar comes mostly from using it yourself, with timers, a battery or an EV.

By the Chux Electrical team. Updated 31 October 2026. 3 min read.

An installer in hi-vis bending over to clamp a panel to its rail

01

What changed

The Essential Services Commission used to set a minimum feed-in tariff each year. After an amendment to the Electricity Industry Act 2000 in May 2025, it no longer does. The 2024 to 2025 minimum, a flat 3.3 cents per kWh, applied until 30 June 2025. From 1 July 2025 retailers set their own feed-in tariffs, which cannot be below zero.

For comparison, the commission had already decided a 2025 to 2026 flat minimum of 0.04 cents per kWh before the law changed. It never applied, but it shows where export values were heading.

02

Why it matters

Buying power costs far more than you are paid to export it. On the Victorian Default Offer for 2026 to 2027, the Essential Services Commission puts a typical Powercor household bill at $1,633 a year on a flat tariff, for 4,000 kWh. Every kWh you use from your own panels instead of buying it is worth the full buy rate. Every kWh you export is worth whatever your retailer's feed-in tariff is.

That is the case for sizing solar to your usage and plans, not just the roof. See what size solar system a Geelong home needs.

Close drone view of black solar panels fixed to a corrugated roof

03

Export limits in Powercor areas

Powercor, the network for most of the Geelong region, sets how much a new system can export when your installer applies for pre-approval. Where that pre-approval comes back as zero, Powercor offers flexible exports: exports matched to the network's real-time capacity, up to the inverter's limit or 10 kW. Powercor says its trial participants exported freely more than 90% of the time.

Since 1 October 2024, new, upgraded and replacement solar systems in Victoria up to 200 kVA must meet the emergency backstop rules. That means CSIP-AUS compatible equipment connected to the internet, so the network can reduce solar output in a rare emergency. We handle the pre-approval and set this up as part of the install.

04

How to get more from your solar

The aim is to use more of what you make, when you make it.

  • Run the dishwasher, washing machine and pool pump in the middle of the day, on timers.
  • Put hot water on a timer, or switch to heat pump hot water.
  • Charge an EV at home in daylight. See our EV charger guide.
  • Store the surplus in a battery for the evening.
  • Compare plans, including the Midday Power Saver, on Victorian Energy Compare.

Common questions

Is there a minimum feed-in tariff in Victoria?

No. The Essential Services Commission stopped setting one after a 2025 law change. Since 1 July 2025 retailers set their own feed-in tariffs, which cannot be below zero.

What was the last minimum feed-in tariff in Victoria?

A flat 3.3 cents per kWh, which applied in 2024 to 2025 until 30 June 2025.

Can my retailer charge me for exporting solar?

In Victoria, retailer feed-in tariffs cannot be below zero cents per kWh, according to the Essential Services Commission.

What is the solar export limit in Geelong?

Powercor sets it for each address at pre-approval. If it comes back as zero, Powercor offers flexible exports, which let eligible systems export up to the inverter limit or 10 kW when the network has room.

Get a free on-site quote.

Tell us what you need. We reply within 24 hours. Solar, batteries, EV chargers and other installs get a free on-site quote with a fixed price in writing; repairs and fault-finding are charged by the hour.

Or call us

0490 503 073

Step 1 of 3: The job

What do you need?
Where is the job?
How do we reach you?

Install quotes are free, on site, no obligation. Repairs are charged hourly. We reply within 24 hours.