Skip to content
Chux Electrical Services

Commercial solar in Geelong

Chux Electrical designs and installs commercial solar for Geelong businesses, from shops and gyms to warehouses and offices. We size the system to the power you use during trading hours, handle the network and certificate paperwork, and our own licensed team does the install, as we did for the 20 kW system at Corner Boxing Co in South Geelong.

A finished solar array on the roof, with a painted mural on the wall behind

Chux Electrical installs commercial and business solar across Geelong, the Surf Coast and the Bellarine. We are a local team based in Breakwater, owned by Colin Norris and licensed under REC 24227. The person who quotes your job does the work, with no subcontractors, and every quote is free, on site and a fixed price in writing.

01

Why solar often suits a business better than a home

A typical household uses most of its power in the morning and evening, when the panels are producing little. Many businesses are the opposite. Shops, gyms, workshops, cafes and offices use power through the middle of the day, which is exactly when solar produces the most.

When the power is used on site as it is produced, it replaces power you would otherwise buy from the grid. That is usually worth far more than exporting it. So the first thing we look at is not the roof, it is your load: what runs, when it runs and how much it uses.

If your power use peaks in the evening or overnight, a battery may be worth a look as well. Our battery page explains how we decide whether one suits.

02

Our commercial job at Corner Boxing Co, South Geelong

We installed a 20 kW rooftop solar system for Corner Boxing Co in South Geelong. The building has a large corrugated metal roof and a painted mural car park, and the job meant laying out mounting rails across the roof, fixing several arrays in long rows and working safely at height with harnesses and a scissor lift.

The photos on our work page are from that job, taken by drone and on the roof with our crew: the bare roof before, the rails going down, and the finished arrays. They are real photos of our team, not stock images.

03

How we size a commercial system

Bigger is not automatically better. A system that produces far more than the business can use during the day ends up exporting much of its output, and the network may limit how much you can export. We size to the load first, then look at the roof space and the export limit.

  • Your bills and, where available, interval data showing usage through the day
  • Trading hours and any seasonal changes in the business
  • Roof type, area, pitch, orientation and shading
  • Switchboard capacity and the distance from the roof to the board
  • The network connection and export limit for your site
  • Plans to add a battery, EV chargers or more equipment later

04

Certificates and the 1 MW small-scale limit

Eligible solar systems can create small-scale technology certificates (STCs), which reduce the upfront cost. The Clean Energy Regulator has expanded the Small-scale Renewable Energy Scheme for eligible solar PV systems from 100 kW to 1 MW. The change applies to mid-scale solar installed from 1 October 2026, Check with the Clean Energy Regulator for when applications open.

Above 1 MW, a system is not eligible for STCs and is treated as a power station under the large-scale scheme instead. Most business rooftops in Geelong are well under that size. The rules and certificate values change, so we confirm what applies to your system on the quote. See the Clean Energy Regulator for the current rules, and our rebates page for the wider picture.

05

The install, step by step

After the site visit we give you a written quote with the equipment, the scope and the timing set out. Once you go ahead, we lodge the network application and plan the access, the material delivery and the safety setup for the roof.

On site, the rails go down first, then the panels, then the cabling to the inverter and the switchboard. If the main board needs work to take the new system, we tell you at the quote, not on the day. See our switchboard upgrades page for what that can involve. We finish with testing, the Certificate of Electrical Safety and a walk through the monitoring.

On the job

  • Top-down drone view of the roof with mounting rails laid out, before the panels go on
  • An installer carrying a solar panel across the roof past a painted mural
  • An installer on a scissor lift against the sun, beside the building wall

What you get.

  1. 01

    Site visit and load review

    We look at the roof, the main switchboard and your electricity bills or interval data, and work out when the business actually uses power.

  2. 02

    System design

    Panel layout, inverter choice and string design matched to your roof, your daytime load and what the network will allow you to export.

  3. 03

    Network and certificate paperwork

    We prepare the Powercor connection application and the small-scale certificate paperwork where the system qualifies.

  4. 04

    Safe work at height

    Commercial roofs mean edge protection, harnesses and lifts. We plan access before the job so the install runs safely and to schedule.

  5. 05

    Installed around your trading

    We talk through your hours and plan the shutdown for the switchboard connection so it disrupts customers and staff as little as possible.

  6. 06

    Monitoring and handover

    We set up the monitoring so you can see what the system produces, and walk the owner or manager through how it works.

Common questions

Do you install solar for businesses in Geelong?

Yes. We install commercial rooftop solar for Geelong businesses, including the 20 kW system at Corner Boxing Co in South Geelong. We visit the site, review your power use and roof, prepare the network application and install the system with our own licensed team. Call 0490 503 073 to book a site visit.

Is commercial solar worth it for a small business?

It often suits businesses that use most of their power during the day, because the solar is used on site as it is produced instead of being exported. It is harder to justify if most of your use is at night or the roof is heavily shaded. We work it out from your bills and tell you plainly.

Can a commercial solar system get STCs?

Yes, if it is eligible. The Clean Energy Regulator has expanded the small-scale scheme for solar PV from 100 kW to 1 MW for systems installed from 1 October 2026. Check with the Clean Energy Regulator for when applications open. Larger systems fall under the large-scale scheme. We confirm what applies on your quote.

Will installing solar disrupt my business?

Most of the work happens on the roof, so the business can usually keep trading. The power has to be off for part of the switchboard connection. We talk through your trading hours first and plan that shutdown for a quiet time, and tell you how long it will take in advance.

Can I add a battery to commercial solar later?

Usually, yes. If a battery is likely, we can choose an inverter and layout that make adding one simpler. The connection agreement with the network has to be amended when a battery goes in, and we handle that paperwork as part of the job.

Do I need permission from my landlord to put solar on a leased building?

Yes. If you lease the premises, the building owner needs to agree to solar on the roof, and the lease may set out who owns the system and who looks after it. We can talk the owner or their agent through the design and the install so everyone knows what is proposed.

Get a free on-site quote.

Tell us what you need. We reply within 24 hours. Solar, batteries, EV chargers and other installs get a free on-site quote with a fixed price in writing; repairs and fault-finding are charged by the hour.

Or call us

0490 503 073

Step 1 of 3: The job

What do you need?
Where is the job?
How do we reach you?

Install quotes are free, on site, no obligation. Repairs are charged hourly. We reply within 24 hours.